Instructions:
Add customer last name and project number. Who and when initially fills this document out? Backyard Consultant, during the Color Selection Meeting with client which is approx. 1-2 Weeks after the project is sold. Who updates this Work Order? Once the Backyard Consultant has filled this out at the Color Selection Meeting, the Designer will then update the Work Order after the design is approved. Once its updated by the Designer, the Backyard Consultant will then look over and utilize this to update the Project Invoice. If any other changes are needed to be made, this will be complete by the Project Team. Once your portion is complete, comment/tag the next team member to alert them you're final with your portion and that it's their turn. Designer to fill out yellow highlighted fields and add actual quantities Outdoor decorator to fill out pink highlighted fields Backyard Consultant to fill out all other fields and add quantities for ordering - blue highlighted fields Backyard consultant to verify entire work order INPUT HYPERLINK below ONLY once that section is FINAL. ---------------------------------------------
Client Name:
Backyard Consultant:
Buildout Team on Project:
Property Address:
County:
Permit: #XXXXX
HOA: YES or NO
Gated community: YES or NO
Special entry notes: (gate code?)
Hard Deadline:
---------------------------------------------
Hyperlinks: Appliance Invoice / Project Invoice / Working Drawings / Take-Offs / Site Plan / Renderings / Building Documents
---------------------------------------------
Material
Portland Quantity of Bags: Tremron Products
Other Tremron Products (Ex. Polymeric Sand, Porcelain Paver Gator Spacers, 1 ton bag of Mason sand, etc) Stonegate
(Total of all Retaining, Seating, Column, Planter, Steps, etc)
Instructions:
Separate different functions and provide face sq. ft. Total all functions face sq. ft. Filter Cloth (yes or no): Face square footage: (retaining wall - please round up to the nearest 6" increment in height as stonegate wall goes below grade) Actual Retaining face sq. ft.: Actual Seating face sq. ft.: Actual Column face sq. ft.: 20"x20"x24" = 8 face sq. ft. 20"x20"x30" = 10 face sq. ft. 20"x20"x36" = 10 face sq. ft. 26"x26"x36" = 16 face sq. ft. 26"x26"x42" = 19 face sq. ft. 30"x30"x36" = 20 face sq. ft. 30"x30"x42" = 24 face sq. ft. Actual Planter face sq. ft.: Actual Step face sq. ft.: Actual Kitchen face sq. ft.: Outdoor Kitchen
Instructions:
Provide linear footage of exterior sides Provide total sq. ft. of countertops Countertops (Granite or Concrete): Finish (Applies to Concrete Countertops - exposed aggregate or standard): Countertop total square footage: Actual XX sq. ft.,( before cutouts) Order XX slab qty. Actual Floating Bar sq. ft.: Bar overhang (yes or no): Floating bar (yes or no): Fire Feature(s)
Instructions:
Provide linear footage of exterior sides Provide total sq. ft. of granite or concrete countertop if applicable Gas or Wood Burning (If Gas, what type): Gas Fireplace Insert (yes or no): Rolled Lava or Standard Lava: If Standard Lava, Black or Red?: Munich Fire Pit Kit (add 25 caps per kit) (yes or no): Size (linear ft. and height): Actual Countertop sq. ft. (does not include cut outs): Order Countertop sq. ft.: Countertop material (caps, concrete or granite): Total Stonegate
(Total of all Retaining, Seating, Column, Planter, Steps, Kitchen, and Fire Features)
Instructions: